Vortex Aerotec · Milestones

Progress

Built. Flown. Proven. Every step from first lift-off to full scale, as it happens.

Scroll
Milestones

Not a roadmap.
A track record.

2026

Full mission

  1. Manufacturing start F1

    Production of the 6 m full-scale prototype begins.

  2. Hydrogen in every flight phase

    One of the first eVTOL teams worldwide.

  3. Fully autonomous mission

    Take-off, transition, cruise, landing.

2025

Hydrogen

  1. Factory running, round closed

    Machinery installed, new prototype built, investment secured.

  2. New home

    400 m² for sub- and full-scale production.

  3. Hydrogen-powered flight

    In the air on hydrogen. Patent validated.

  4. First flights of S2

    Weather robustness confirmed.

  5. S2 powertrain finished

    Ground testing complete.

  6. S2 airframe finished

    3.50 m wingspan.

  7. S2 production starts

    More payload, more range, better manufacturing.

  8. BVLOS testing

    Beyond visual line of sight. Design IP protected.

  9. Hydrogen ground tests

    First run of the fuel cell powertrain.

2024

Lift-off

  1. First autonomous flight

    Waypoint mission, no pilot.

  2. Full transition

    From hover to wing-borne flight at 110 km/h.

  3. Open airfield

    Stable flight at speed. Simulations confirmed.

  4. First flight of S1

    The sub-scale prototype lifts off.

  5. S1 airframe finished

    Carbon composite, record-low structural weight.

  6. Vortex Aerotec GmbH founded

    Industrial drone logistics, now as a company.

  7. Powertrain patent pending

    A fuel cell architecture made for vertical flight.

  8. Public funding

    EXIST, ESA BIC and more back the project.

  9. S1 production starts

    Sub-scale prototype: 3.40 m span, 250 km at 6 kg.

  10. Project start

    Accepted at the TUM incubator, with access to its MakerSpace.

The team behind it

Still young,
but moving fast.